Multi Level Commercial Premises, St Leonards, NSW.
Replacement of the chiller system with multiple split ducted systems allowing flexibility of control and greatly reduced operating costs.
Warren Yaghts
Nicholls Air is proud to be part of the on-going refurbishment works at Warren Yachts.
Christmas Island - Resort HVAC Refurbishment
Four containers of equipment left our shores on 15 February 2007 bound for a 4 week voyage and then a 6 week intensive project. Everything has been meticulously planned and we look forward to an oustanding result for our customer.
Make an enquiry with Nicholls Air TODAY>